News and Announcements

William “Bill” Dobie, photo by Rob DeSanto
May 21, 2024
A master of pipes of all types, William “Bill” Dobie has repaired countless makes and models to keep the university running since 1974.
Pictured from left: Vincent Giordano III, project executive at Giordano Construction; Bryan D'Orlando, associate director of construction project management in the Yale Office of Facilities; Shellie Anello, construction project manager in the Yale Office of Facilities. Photo by Stephanie Anestis.
May 13, 2024
There is a real-world lesson in renewable energy taking place at Yale—one that’s happening outside the labs and classrooms.
USHD from Whitney Avenue facing northwest, rendering by Ballinger and TenBerke, courtesy of Yale Office of Facilities
May 8, 2024
This program re-envisions Science Hill with the goal of creating a new research-intense structure, the Physical Sciences and Engineering Building, among others.
Connectivity between 87 Trumbull Street and 30 Hillhouse Avenue with fritted glass, photo by Chuck Choi
April 30, 2024
The Yale Bird-Friendly Building Initiative aims to accelerate the adoption of bird-friendly design to reduce deadly collisions.
Front row, from left, Peabody Director David Skelly, President Peter Salovey, Edward P. Bass, Sasha Bass, Provost Scott Strobel, and Susan Payson Burke. Back row, from left, Mark Simon, Alison Richard, and Lisa Whitescarver. (Photos by Dan Renzetti)
April 18, 2024
A ribbon-cutting ceremony signals the beginning of a new era for the revitalized Yale Peabody Museum.
Sterling Memorial Library’s beloved L&B Room has reopened this week following a floor-to-ceiling renovation. (Photos by Dan Renzetti)
April 15, 2024
Sterling Memorial Library’s Linonia and Brothers room reopens after an extensive renovation that updated this campus gem while preserving its beloved features.
The Malone Engineering Center is the starting point for a new, networked geothermal exchange system that will eventually serve lower Hillhouse Avenue. Photo by Dan Renzetti.
March 26, 2024
A historic renovation at Yale’s Malone Engineering Center marks a key first step in the development of a new networked geothermal exchange system.